{"id":1463,"date":"2026-09-29T13:11:55","date_gmt":"2026-09-29T11:11:55","guid":{"rendered":"https:\/\/rczoneprerov.cz\/rc-zone-prerov-has-obtained-a-final-building-permit-rc-europe-builds-on-its-success-in-croatia\/"},"modified":"2026-09-29T13:22:06","modified_gmt":"2026-09-29T11:22:06","slug":"rc-zone-prerov-has-obtained-a-final-building-permit-rc-europe-builds-on-its-success-in-croatia","status":"publish","type":"post","link":"https:\/\/rczoneprerov.cz\/en\/rc-zone-prerov-has-obtained-a-final-building-permit-rc-europe-builds-on-its-success-in-croatia\/","title":{"rendered":"RC Zone P\u0159erov has obtained a final building permit. RC Europe builds on its success in Croatia"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The RC Zone P\u0159erov project has reached a significant milestone. In August 2026, it received a final building permit, and RC Europe is now preparing to begin construction, which is scheduled for this fall.  <\/p>\n\n<p class=\"wp-block-paragraph\">A new industrial complex will be built between the site of the former P\u0159erovsk\u00e9 stroj\u00edren and the Hen\u010dlov district, approximately 300 meters from the D1 highway exit. The project will feature three separate warehouses with a total leasable area of approximately 48,400 m\u00b2, intended primarily for manufacturing and related warehousing. Thanks to its location between Brno and Ostrava, the complex will provide efficient access not only to the Czech market but also to Poland, Slovakia, and Austria.   <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Experiences from Samobor are heading to P\u0159erov<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">In developing the RC Zone P\u0159erov project, RC Europe aims to build on the experience and success of its RC Zone Samobor industrial project in Croatia. The first phase of that project, covering an area of approximately 43,000 m\u00b2, was completed in 2025 and fully leased even before the project was finished. Tenants include DSV, dm-drogerie markt, Mil\u0161ped, Logaritam, and Commel.   <\/p>\n\n<p class=\"wp-block-paragraph\">At the same time, RC Zone Samobor is moving forward with its second phase. Once completed, the entire complex will feature more than 90,000 m\u00b2 of modern industrial and warehouse space. The total investment in the project exceeds 100 million euros.   <\/p>\n\n<p class=\"wp-block-paragraph\">RC Europe also plans to apply the experience gained during the development of Samobor to the project in P\u0159erov\u2014particularly in the areas of technical solutions, energy, and the coordination of technologies and requirements for large-scale manufacturing and logistics operations. <\/p>\n\n<p class=\"wp-block-paragraph\">\u201cWe don\u2019t view P\u0159erov as a copy of Samobor. Every market and every project has different conditions. What we want to bring over is our approach: a high-quality location, adequate energy and technical infrastructure, high-standard buildings, and, above all, the ability to tailor the project to the tenant\u2019s actual operations. Samobor shows that this approach works,\u201d says Anton\u00edn Dillenz, CEO of RC Europe for the Czech Republic and Croatia.    <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Nearly 50,000 m\u00b2 of modern industrial space<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">RC Zone P\u0159erov is being developed primarily with the needs of manufacturing companies and their supply chains in mind. The project calls for a clear height of 12 meters, a column grid of 12 \u00d7 24 meters, and an industrial floor load-bearing capacity of 7 t\/m\u00b2. Energy efficiency will also be a key component of the project\u2014the buildings will utilize zero-emission heating systems, and the roofs are designed to support large-scale electricity generation from photovoltaic sources. RC Europe plans to pursue certification under the BREEAM Outstanding standard.    <\/p>\n\n<p class=\"wp-block-paragraph\">The total investment in RC Zone P\u0159erov will exceed one billion crowns. Construction will take place in phases, and depending on the scope of each phase, the project is expected to take approximately 12 to 14 months to complete.  <\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Construction of the RC Zone in P\u0159erov is scheduled for fall 2026.<\/strong><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1300\" height=\"975\" data-id=\"1458\" src=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0971-1300x975.jpeg\" alt=\"\" class=\"wp-image-1458\" srcset=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0971-1300x975.jpeg 1300w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0971-480x360.jpeg 480w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0971-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1300px) 100vw, 1300px\" \/><figcaption class=\"wp-element-caption\">RC Zone P\u0159erov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1300\" height=\"975\" data-id=\"1456\" src=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0972-1300x975.jpeg\" alt=\"\" class=\"wp-image-1456\" srcset=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0972-1300x975.jpeg 1300w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0972-480x360.jpeg 480w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0972-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1300px) 100vw, 1300px\" \/><figcaption class=\"wp-element-caption\">RC Zone P\u0159erov<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1300\" height=\"975\" data-id=\"1454\" src=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0973-1300x975.jpeg\" alt=\"\" class=\"wp-image-1454\" srcset=\"https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0973-1300x975.jpeg 1300w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0973-480x360.jpeg 480w, https:\/\/rczoneprerov.cz\/wp-content\/uploads\/2026\/09\/IMG_0973-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1300px) 100vw, 1300px\" \/><figcaption class=\"wp-element-caption\">RC Zone P\u0159erov<\/figcaption><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The RC Zone P\u0159erov project has reached a significant milestone. In August 2026, it received a final building permit, and RC Europe is now preparing to begin construction, which is&#8230;<\/p>\n","protected":false},"author":4,"featured_media":1459,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1463","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/posts\/1463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/comments?post=1463"}],"version-history":[{"count":1,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/posts\/1463\/revisions"}],"predecessor-version":[{"id":1464,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/posts\/1463\/revisions\/1464"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/media\/1459"}],"wp:attachment":[{"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/media?parent=1463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/categories?post=1463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rczoneprerov.cz\/en\/wp-json\/wp\/v2\/tags?post=1463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}